Built in 3D.
Delivered with Precision.
From 3D design coordination to Leica machine control and digital safety exclusion zones — technology is how we protect your programme, your budget, and your people.
3D Design Coordination
We model every project in 3D before a machine moves on site — buildings, yards, drainage, and underground services all coordinated together. Design clashes are identified and resolved in the model, not on site.
Fewer surprises, better programme certainty, and cost control through early issue resolution.

Leica Total Stations
Our Leica robotic total stations provide millimetre-accurate setting out across all our projects. 3D models are pushed directly from the design environment to the station — eliminating manual data entry and reducing error.
What you design is exactly what gets built.

GPS Rover Systems
Real-time GPS positioning across the full site. Our crews use GPS rovers for bulk earthworks verification, drainage as-builts, and general site control — all tied back to the project model.
Fast, accurate site verification without relying on traditional pegs.

Leica MC2 Machine Control
Our excavators and earthworks machinery are equipped with Leica MC2 machine control — the 3D design model is loaded directly into the cab, guiding the operator with real-time cut/fill guidance and grade checking.
Faster earthworks, less re-grading, and pavement layers placed right first time.
Leica iCON X Watch — Digital Exclusion Zones
Leica X Watch creates digital exclusion zones around live plant and machinery. Workers and operators receive real-time proximity alerts — both in the cab and on a wearable device — when entering defined danger zones. Zones are defined digitally and can be adjusted instantly as the site evolves.
Active, intelligent safety protection that moves with the hazard.

